...
首页> 外文期刊>Military operations research >Deformation analysis and reinforcement of jin-gang tower in jacking method
【24h】

Deformation analysis and reinforcement of jin-gang tower in jacking method

机译:顶进法金刚塔变形分析与加固

获取原文
获取原文并翻译 | 示例
           

摘要

Purpose - This paper aims to first analyze the reasons of a brick-wooden building tilts in Yunnan province in China. Then, a jacking method which combines the stress release methods and the excavation of stress release trench were put forward. Design/methodology/approach - This method uses the anchor static pile to guarantee the safety of the building in the process of rectifying. Findings - The practice showed that the inclination rate of the building was stable in the process of jacking, which proved the efficiency of the proposed method. Originality/value - It has a great value for similar rectification projects, and for the protection of cultural heritage and ancient buildings have a positive effect.
机译:目的-本文旨在首先分析中国云南省一座砖木建筑倾斜的原因。然后,提出了一种结合应力释放方法和应力释放沟槽开挖的顶进方法。设计/方法/方法-此方法使用锚固桩来确保建筑物在整改过程中的安全。发现-实践表明,在顶进过程中建筑物的倾斜率是稳定的,证明了所提方法的有效性。原创性/价值-对于类似的整改项目具有极大的价值,对于文化遗产和古建筑的保护也具有积极作用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号