...
首页> 外文期刊>Mathematical Problems in Engineering >Strain Analysis of the Nuozhadu High Rockfill Dam during Initial Impoundment
【24h】

Strain Analysis of the Nuozhadu High Rockfill Dam during Initial Impoundment

机译:糯扎渡高堆石坝初始蓄水过程中的应变分析

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The safety of rockfill dams during initial impoundment has always been an issue of interest for regulatory agencies. Specifically, it is necessary to identify potential tensile strain zones and shear strain concentration zones in which cracks may form. In this paper, a meshless smoothing method is proposed to construct the strain field of a prototype dam based on monitoring displacement data. For verification, this method is applied to calculate the strain field of the Nuozhadu core wall rockfill dam. The results show that the proposed method can provide regulatory agencies with an effective tool for dam inspection during initial impoundment.
机译:最初蓄水期间堆石坝的安全一直是监管机构关注的问题。具体而言,有必要确定可能在其中形成裂纹的潜在拉伸应变区和剪切应变集中区。本文提出了一种基于监测位移数据的无网格平滑方法来构造原型大坝的应变场。为了进行验证,该方法用于计算糯扎渡岩心墙堆石坝的应变场。结果表明,所提出的方法可以为监管机构提供有效的工具,用于在初期蓄水期间进行大坝检查。

著录项

  • 来源
    《Mathematical Problems in Engineering》 |2018年第9期|7291473.1-7291473.12|共12页
  • 作者

    Lv Xiaolong; Chi Shichun;

  • 作者单位

    Dalian Univ Technol, State Key Lab Coastal & Offshore Engn, Dalian 116024, Liaoning, Peoples R China;

    Dalian Univ Technol, Inst Earthquake Engn, Fac Infrastruct Engn, Dalian 116024, Liaoning, Peoples R China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号