首页> 外文期刊>Magazine of Concrete Research >Distribution of construction loads in columns and shores during construction of reinforced concrete structures
【24h】

Distribution of construction loads in columns and shores during construction of reinforced concrete structures

机译:钢筋混凝土结构施工过程中柱和岸的施工荷载分布

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Many studies have been performed to apply research results for the time-dependent behaviour of reinforced concrete (RC) framed structures to the design and construction of high-rise buildings. However, shoring, removal of forms, and backshoring at early ages have not been adequately reflected in most studies. Removal of forms and backshoring activities have been dealt with as one construction sequence and the deformation of columns that occurs at an early age before removal of shores was not considered. In this study, a two-dimensional frame analysis program was developed to predict time-dependent behaviour of RC structures. In the program, the actual construction sequence of installation of forms and shores, concrete placement, removal of forms and shores, backshoring, removal of backshores, and application of additional loads are considered to predict axial force variations in RC columns and shores due to the change of concrete member stiffness. In order to evaluate the validity of the developed program, a model RC-framed specimen was tested under the same construction sequence. It was noted that with increasing time the axial forces in columns and shores were increased and decreased, respectively. In addition, column deformations occurred before removal of shores and axial forces in shores were redistributed to columns. Finally, it was also observed that the program predicted experimental results well.
机译:为了将钢筋混凝土框架结构随时间变化的行为应用于高层建筑的设计和施工,已经进行了许多研究。但是,在大多数研究中,早期的支撑,形式去除和返流没有得到充分反映。拆除形式和返修活动已作为一个施工顺序进行了处理,并且考虑了在拆除海岸之前的早期发生的圆柱变形。在这项研究中,开发了二维框架分析程序来预测钢筋混凝土结构的时间依赖性行为。在该程序中,考虑了模板和海岸的安装,混凝土浇筑,模板和海岸的拆除,后向支撑,后岸的拆除以及施加附加载荷的实际施工顺序,以预测RC柱和支架的轴向力变化。混凝土构件刚度的变化。为了评估所开发程序的有效性,在相同的构造顺序下对模型RC框架标本进行了测试。注意到随着时间的增加,在圆柱和岸上的轴向力分别增加和减小。此外,在移开支撑之前,发生了柱变形,并且将支撑中的轴向力重新分配给了柱。最后,还观察到该程序很好地预测了实验结果。

著录项

  • 来源
    《Magazine of Concrete Research》 |2004年第6期|p.347-358|共12页
  • 作者

    T.-G. Lee; S.-Y. Kim; S.-T. Yi;

  • 作者单位

    Department of Civil & Environmental Engineering, Woosong University, 17-2, Jayang-dong, Dong-gu, Daejeon-si, 300-718, South Korea;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 水泥工业;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号