...
首页> 外文期刊>Journal of surveying engineering >Evaluation of the Movements of the Dam Embankments by Means of Geodetic and Geotechnical Methods
【24h】

Evaluation of the Movements of the Dam Embankments by Means of Geodetic and Geotechnical Methods

机译:用大地测量和岩土工程方法评价大坝堤防的运动

获取原文
获取原文并翻译 | 示例
           

摘要

In this study, the evaluation of the surface movements that took place after the completion of an earth fill dam constructed by staged construction have been evaluated by means of geodetic and geotechnical methods. Horizontal and vertical displacement measurements which were recorded between the years of 1987-1991 and 1991-1996 have been analyzed geodetically by using the Karlsruhe method. In both measurement periods, significant horizontal and vertical movements were found from adjustments and analyses of the measurements. The behavior of the dam and its foundation layers were analyzed by utilizing finite element method in two-dimensional plane-strain conditions to determine the horizontal and vertical surface movements. The results of geodetic measurements were compared with the results of the numerical analysis, and it is observed that there is a good agreement between the field measurements and computed values.
机译:在这项研究中,已经通过大地测量和岩土工程方法评估了分阶段施工的土石坝建成后发生的地表运动。 1987-1991年和1991-1996年之间记录的水平和垂直位移测量结果已通过卡尔斯鲁厄方法进行了大地测量分析。在两个测量周期中,通过对测量值的调整和分析发现了明显的水平和垂直运动。在二维平面应变条件下,利用有限元方法分析了大坝及其基础层的行为,确定了水平面和水平面的运动。将大地测量的结果与数值分析的结果进行了比较,发现在野外测量和计算值之间有很好的一致性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号