...
首页> 外文期刊>Journal of professional issues in engineering education and practice >Productivity Study of the Scaffolding Operations in Liquefied Natural Gas Plant Construction: Ichthys Project in Darwin, Northern Territory, Australia
【24h】

Productivity Study of the Scaffolding Operations in Liquefied Natural Gas Plant Construction: Ichthys Project in Darwin, Northern Territory, Australia

机译:液化天然气工厂建设中脚手架生产的生产率研究:位于澳大利亚北领地达尔文市的Ichthys项目

获取原文
获取原文并翻译 | 示例
           

摘要

Natural gas usage has increased steadily over the past decades, in line with society's demands for this resource. In turn, allied industries face the challenge of meeting construction needs for required structures, including product facilities, pipe lines, on/offshore platforms, and marine jetties. Subsequently, these structures require huge amounts of scaffolding to facilitate their construction and maintenance. As such, this research project focused on the opportunity for the civil/construction discipline to cooperate with natural gas facility construction, more specifically productivity studies on their scaffolding operations. The productivity study in this paper presents an investigation of the effect of resource configurations on on-site measures during a scaffolding operation on an actual liquefied natural gas (LNG) plant construction, which, in turn, aims for the continuous improvement of relevant worker performance. The discussion details the quantified effect of different scaffold logistics: (1)scaffolding types, (2)scaffolding dimensions, and (3)material resource types. For instance, the system scaffolding as one of the material resource types shows less time spent than the conventional scaffolding's performance (95.1-85.2=9.9min/m2) during the erection phase. Finally, the research findings highlight the civil/construction engineers' obligations in LNG plant projects with an emphasis on its scaffolding needs.
机译:在过去的几十年中,天然气的使用量一直在稳定增长,这与社会对这种资源的需求是一致的。反过来,相关行业也面临着满足所需结构的建筑需求的挑战,包括产品设施,管道,陆上/海上平台和海上码头。随后,这些结构需要大量的脚手架以利于其构造和维护。因此,该研究项目侧重于民用/建筑学科与天然气设施建设合作的机会,更具体地说是对其脚手架运营的生产力研究。本文中的生产率研究提出了对脚手架操作过程中实际液化天然气(LNG)工厂建设中资源配置对现场措施的影响的调查,从而旨在不断提高相关工人的绩效。讨论详细介绍了不同脚手架物流的量化效果:(1)脚手架类型,(2)脚手架尺寸和(3)物料资源类型。例如,在搭建阶段,作为材料资源类型之一的系统脚手架所花费的时间比常规脚手架的性能(95.1-85.2 = 9.9min / m2)要少。最后,研究结果突出了液化天然气工厂项目中土木/建筑工程师的义务,并强调了其脚手架需求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号