Study on high rock slop anchoring technique of large rock engineering

机译:大型岩石工程高边坡锚固技术研究

获取原文
获取原文并翻译 | 示例
           

摘要

Monitoring data from the Three Gorges Project show that the resulted tensile stresses are mainly distributed within the front section of the internal anchoring section which is often measuring 2.5 m in length. The composition of two early strength cement grout mixes marked as R_3350 and R_7350 was successfully developed to accelerate anchoring facilities installation and to reduce its intervention with the shipiock construction. It was measured that the ground water pH value in the sidewall slopes of the permanent navigation shipiock during the construction period was close to 8. Based on those characteristics it is concluded that the groundwater is weakly corrosive to steel material and will appear as non-corrosive to the steel wire strands embedded in the cement grout set. The advanced model of 3 MN unbonded anchor cables with double anti-corrosion protection (including the corrugated pipe) is developed to meet the needs of stabilizing the high sidewall rock slopes of the permanent navigation shipiock on the Three Gorges Project.
机译:来自三峡项目的监测数据表明,所产生的拉应力主要分布在内部锚固段的前部区域,内部锚固段的长度通常为2.5 m。成功开发了两种标记为R_3350和R_7350的早期强度水泥浆混合物,以加速锚固设施的安装并减少其对船坞施工的干预。据测量,永久航行的船闸侧壁在施工期间的地下水pH值接近8。基于这些特征,可以得出结论,地下水对钢铁材料的腐蚀性很弱,并且会表现为非腐蚀性嵌入水泥浆套装中的钢丝绳。开发了具有双重防腐蚀保护功能的3 MN无粘结锚缆的先进模型(包括波纹管),以满足稳定三峡项目永久导航船闸的高侧壁岩石边坡的需求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号