...
首页> 外文期刊>International Power Generation >Successful collaboration energises Heathrow T5
【24h】

Successful collaboration energises Heathrow T5

机译:成功的合作为希思罗T5注入了活力

获取原文
获取原文并翻译 | 示例
           

摘要

Europe's largest engineering project, a fifth Terminal at London Heathrow airport, has proved a huge challenge to the companies charged with designing and installing its power distribution network. IPG reports. Heathrow Airport's Terminal 5 has passed the halfway point in its build, as has the installation of its high voltage power supply. With the help of Schneider Electric, EDF Energy has reached a milestone by energising the 33 incoming 11 kV electrical feeds onto the distribution network.
机译:欧洲最大的工程项目,伦敦希思罗机场的第五航站楼,对负责设计和安装其配电网络的公司构成了巨大挑战。 IPG报告。希思罗机场5号航站楼的建造已经过了一半,高压电源的安装也已通过。在施耐德电气的帮助下,EDF能源公司通过向配电网络中的33个输入11 kV电气馈电供电,达到了一个里程碑。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号