...
【24h】

A reliable power supply

机译:可靠的电源

获取原文
获取原文并翻译 | 示例
           

摘要

Investment in new generating capacity needs to be supported by similar financial backing for the transmission grid. IPG looks forward to its conference on European power quality in Budapest in June. The 2003 blackouts that plagued many regions of the world have had some positive impact. They have forced the political and industrial focus to address the distinct lack of investment in grid networks, certainly compared to new generation capacity. Problems with power quality have arisen because many grid systems were not originally designed for the heavy demand and load profiles that exist today. Many new contracts for substation upgrades and transmission line projects are coming to the fore. In the privatised and deregulated world, transmission systems operators (TSOs) are also under pressure to sanction more repair, maintenance and upgrade work.
机译:输电网需要类似的财政支持来支持对新发电能力的投资。 IPG期待6月在布达佩斯举行的欧洲电能质量会议。困扰世界许多地区的2003年停电产生了一些积极影响。他们迫使政治和工业焦点来解决电网网络明显缺乏的投资,当然与新一代发电能力相比。由于许多电网系统最初并不是为当今的大量需求和负荷状况而设计的,因此出现了电能质量问题。变电站升级和输电线路项目的许多新合同即将浮出水面。在私有化和放松管制的世界中,传输系统运营商(TSO)也面临制裁更多维修,保养和升级工作的压力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号