...
首页> 外文期刊>International Power Generation >Modernising hydro turbines
【24h】

Modernising hydro turbines

机译:水轮机现代化

获取原文
获取原文并翻译 | 示例
           

摘要

Tiszaviz Vizeroemue KFT, owner of Kiskoere, the biggest hydraulic power station in Hungary, located on the river Tisza, decided to carry out a complete modernisation and upgrading of the power station after 28 years of operation. The contract for the general rehabilitation and modernisation was awarded to a consortium of Siemens RT and Voith Siemens Hydro. It will be finished in 2006. The scope of the work is an improvement of the turbine hydraulics by modification of runner blades and wicket gates; a general overhaul of all mechanical components with implementation of maintenance- free distributor bearing systems; a general overhaul of bearing oil lubrication, and cooling systems, as well as the hydraulic part of the turbine governing systems; and a generator rewind. In addition, is the new installation of excitation systems, the implementation of 4 units digital turbine governors, each with unit start-up/stop control system, a joint control-and visualisation system.
机译:位于匈牙利蒂萨河上的匈牙利最大水力发电站Kiskoere的所有者Tiszaviz Vizeroemue KFT决定,经过28年的运营,对该电站进行了全面的现代化和升级。总体修复和现代化合同授予了西门子RT和福伊特西门子水电集团。它将在2006年完成。工作范围是通过修改流道叶片和风门来改善涡轮机的液压性能。采用免维护的分配器轴承系统,对所有机械组件进行全面检修;轴承油润滑,冷却系统以及涡轮机调节系统的液压部分的全面检修;和发电机倒带。此外,还安装了励磁系统,安装了4台数字式涡轮机调速器,每个调速器均配有单元启动/停止控制系统,联合控制和可视化系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号