...
首页> 外文期刊>International journal of project organisation & management >Evaluating the effectiveness of task overlapping as a risk response strategy in engineering projects
【24h】

Evaluating the effectiveness of task overlapping as a risk response strategy in engineering projects

机译:评估任务重叠作为工程项目中的风险应对策略的有效性

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In the last two decades, the failure of multiple engineering projects has highlighted the importance of adopting risk management practices. While risk identification and risk assessment have been widely studied in the literature, only few authors have proposed formal tools for helping project managers to evaluate the effectiveness of their risk response plan. While some risk response measures might be easily validated, overlapping, a commonly used mitigation measure in engineering projects is difficult to evaluate because of the complex interactions between activities and resources. This paper proposes an evaluation model to measure the effectiveness of overlapping strategy as a risk response in terms of additional cost and total maximum time reduction. Results based on a large set of generated projects highlight the importance of three factors in the effectiveness of an overlapping strategy: the number of opportunities of overlapping, the maximum overlapping amount allowed, and the level of resource constraints.
机译:在过去的二十年中,多个工程项目的失败凸显了采用风险管理实践的重要性。尽管文献中对风险识别和风险评估进行了广泛的研究,但很少有人提出正式的工具来帮助项目经理评估其风险应对计划的有效性。尽管某些风险应对措施可能很容易验证,重叠,但由于活动和资源之间的复杂交互,因此难以评估工程项目中常用的缓解措施。本文提出了一种评估模型,以衡量重叠策略作为额外成本和总最大时间减少的风险响应的有效性。基于大量已生成项目的结果强调了重叠策略有效性中三个因素的重要性:重叠机会的数量,允许的最大重叠量以及资源限制的水平。

著录项

  • 来源
  • 作者单位

    Jarislowsky/SNC-Lavalin Research Chair on International Project Management and CIRRELT, Department of Mathematics and Industrial Engineering, Ecole Polytechnique de Montreal, C.P. 6079, succ. Centre-ville, Montreal (QC), H3C 3A7, Canada;

    Jarislowsky/SNC-Lavalin Research Chair on International Project Management and CIRRELT, Department of Mathematics and Industrial Engineering, Ecole Polytechnique de Montreal, C.P. 6079, succ. Centre-ville, Montreal (QC), H3C 3A7, Canada;

    Institut Superieur de Mecanique de Paris, 3 rue Fernand Hainaut, 93407 Saint-Ouen, France;

    Jarislowsky/SNC-Lavalin Research Chair on International Project Management and CIRRELT, Department of Mathematics and Industrial Engineering, Ecole Polytechnique de Montreal, C.P. 6079, succ. Centre-ville, Montreal (QC), H3C 3A7, Canada;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    project management; risk management; concurrent engineering; activity overlapping; scheduling;

    机译:项目管理;风险管理;并行工程;活动重叠;排程;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号