A robust scheduling for the multi-mode project scheduling problem with a given deadline under uncertainty of activity duration

机译:活动持续时间不确定下具有给定期限的多模式项目调度问题的鲁棒调度

获取原文
获取原文并翻译 | 示例
           

摘要

The problem of this paper deals with the multi-mode project scheduling problem under uncertainty of activity duration where only the renewable resources are taken into account and a given deadline has to be met at the cost of recruiting additional resources. A heuristic algorithm is employed to solve this problem, and to maintain the robustness of the baseline schedule, the concept of critical chain project management (CCPM) is applied in which a new definition to resource buffer is considered. A simulation methodology is used to determine the size and location of resource buffers in the schedules in which three different buffer sizes and three different uncertainty levels are considered. Results and analysis of the simulation outcomes illustrate that resource buffers are useful and should be simulated by the CCPM schedules, as they help to decrease the total duration of the project during implementation and meet the deadline of the project with more assurance.
机译:本文的问题涉及在活动持续时间不确定的情况下的多模式项目调度问题,其中仅考虑可再生资源,必须以给定的截止日期为代价,以招募额外资源为代价。采用启发式算法解决此问题,并保持基线计划的鲁棒性,应用了关键链项目管理(CCPM)的概念,其中考虑了对资源缓冲区的新定义。使用一种模拟方法来确定计划中资源缓冲区的大小和位置,其中考虑了三个不同的缓冲区大小和三个不同的不确定性级别。仿真结果的结果和分析表明,资源缓冲区很有用,应由CCPM进度表进行仿真,因为它们有助于减少项目在实施过程中的总工期,并更有把握地满足项目的期限。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号