...
首页> 外文期刊>Ground Engineering >Ground Movement Monitoring at Blackfriars Station
【24h】

Ground Movement Monitoring at Blackfriars Station

机译:黑修士站的地面运动监测

获取原文
获取原文并翻译 | 示例
           

摘要

Strainstall have provided an extensive monitoring systemrnfor the Blackfriars Station Redevelopment project in London. The underground part of the station has been demolished and excavation of the site is underway before reconstruction starts. To keep the railway and underground lines operating safely, 10 main areas are monitored including:- neighbouring listed buildings, tunnels containing power, telecoms and gas services, the station itself, the London Underground District and Circle sub-surface tunnels and Waterloo and City deep tunnels.
机译:Strainstall为伦敦的Blackfriars Station重建项目提供了广泛的监控系统。车站的地下部分已被拆除,在重建工作开始之前正在进行场地挖掘。为确保铁路和地下线路安全运行,对10个主要区域进行了监视,这些区域包括:邻近的受保护建筑物,包含电力,电信和天然气服务的隧道,车站本身,伦敦地下区和Circle地下隧道以及滑铁卢和城市深处隧道。

著录项

  • 来源
    《Ground Engineering》 |2010年第4期|p.33|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号