首页> 外文期刊>Geothermics >Main aspects of geothermal energy in Mexico
【24h】

Main aspects of geothermal energy in Mexico

机译:墨西哥地热能的主要方面

获取原文
获取原文并翻译 | 示例
           

摘要

With an installed geothermal electric capacity of 853 MW_e, Mexico is currently the third largest producer of geothermal power worldwide, after the USA and the Philippines. There are four geothermal fields now under exploitation: Cerro Prieto, Los Azufres, Los Humeros and Las Tres Virgenes. Cerro Prieto is the second largest field in the world, with 720 MW_e and 138 production wells in operation; sedimentary (sandstone) rocks host its geothermal fluids. Los Azufres (88 MW_e), Los Humeros (35 MW_e) and Las Tres Virgenes (10 MW_e) are volcanic fields, with fluids hosted by volcanic (andesites) and intrusive (granodiorite) rocks. Four additional units, 25 MW_e each, are under construction in Los Azufres and due to go into operation in April 2003. One small (300 kW) binary-cycle unit is operating in Maguarichi, a small village in an isolated area with no link to the national grid. The geothermal power installed in Mexico represents 2% of the total installed electric capacity, but the electricity generated from geothermal accounts for almost 3% of the national total.
机译:墨西哥的地热发电装机容量为853 MW_e,目前是仅次于美国和菲律宾的全球第三大地热发电国。目前有四个地热田正在开发中:塞罗普列托,洛斯阿祖夫雷斯,洛斯胡梅罗斯和拉斯特雷斯维吉涅斯。塞罗普列托(Cerro Prieto)是世界第二大油田,拥有720兆瓦电当量和138口生产井。沉积岩(砂岩)蕴藏着其地热流体。 Los Azufres(88 MW_e),Los Humeros(35 MW_e)和Las Tres Virgenes(10 MW_e)是火山场,其流体由火山岩(安山岩)和侵入性(碎屑闪长岩)所包裹。另外四台机组,每台25 MW_e,正在Los Azufres进行建设,定于2003年4月投入运行。一台小型(300 kW)二元循环机组正在Maguarichi运营,Maguarichi是一个偏远地区的小村庄,与城市没有联系。国家电网。墨西哥安装的地热发电量占总装机容量的2%,但地热发电量约占全国总量的3%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号