首页> 外文期刊>Geothermics >Practical experience in the reinjection of cooled thermal waters back into sandstone reservoirs
【24h】

Practical experience in the reinjection of cooled thermal waters back into sandstone reservoirs

机译:将冷却的热水重新注入砂岩储层的实践经验

获取原文
获取原文并翻译 | 示例
           

摘要

Intensive investigations into the utilisation of the geothermal potential of the North German Basin began in the early 1980s. The first production and reinjection tests from/into sandstone reservoirs started in 1982 and led to the commissioning of the first geothermal heating plant for heat supply to a residential area in the town of Waren (Mueritz) in 1984. More plants were put into operation in Neubrandenburg, Neustadt-Glewe and Berlin. The use of these sandstone reservoirs for heat storage produced new technical solutions. A precise knowledge of the geological and geochemical conditions forms an essential prerequisite for the successful planning, construction and operation of geothermal plants. This paper describes the geological and geochemical conditions, as well as the technical solutions and practical experience acquired so far.
机译:1980年代初开始对北德盆地的地热潜力利用进行深入研究。 1982年开始了对砂岩储层的首次生产和注入测试,并于1984年启用了第一座地热供热厂,为瓦伦镇(Mueritz)的一个居民区供热。 Neubrandenburg,Neustadt-Glewe和柏林。这些砂岩储层的使用产生了新的技术解决方案。准确了解地质和地球化学条件,是成功规划,建造和运营地热电厂的重要前提。本文介绍了地质和地球化学条件,以及迄今为止获得的技术解决方案和实践经验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号