【24h】

NASSCO enters Jones Act fray

机译:NASSCO进入琼斯法案的竞争

获取原文
获取原文并翻译 | 示例
           

摘要

The delivery date for the first ship in the US Shipping (USS) series remains 2Q09, with additional deliveries every six to eight months through to 2014, "but we are trying to better that schedule", said Tim McCue, director of business development and strategic planning for the San Diego yard. "We are pleased with the rate of progress towards construction," he said, reporting that "the pilot block - an engine section - will be in the yard in May, with keel con- struction starting in November or December this year."
机译:美国业务拓展与业务总监Tim McCue表示,美国航运(USS)系列首艘船的交货日期仍为2009年第二季度,每六至八个月至2014年将有更多交付,但“我们正在努力改善这一时间表”。圣地亚哥船厂的战略规划。他说:“我们对施工进度感到满意,并报告说:“先导块-发动机部分-将于5月在院子里,龙骨的建造将于今年11月或12月开始。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号