首页> 外文期刊>Fairplay Solations with Newbuildings >Tapping the well of tanker building
【24h】

Tapping the well of tanker building

机译:挖掘油轮建筑的井

获取原文
获取原文并翻译 | 示例
           

摘要

The accelerated phase-out of single-hull tankers has created a bonanza for builders and equipment-makers alike, including those that manufacture cargo pumps and pumping systems. MARPOL Annex Ⅱ, which came into force on 1 January this year, also requires more efficient stripping arrangements on new vessels, which will be allowed only 75 litres of residue in place of the old allowance of between 100 litres and 300 litres depending on cargo type.
机译:单壳油轮的加速淘汰为建造商和设备制造商(包括制造货泵和泵系统的制造商)和设备制造商创造了一笔财富。 MARPOL附则Ⅱ于今年1月1日生效,它还要求对新船进行更有效的剥离安排,根据货物类型的不同,将仅允许75升残渣代替100升至300升之间的旧配额。 。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号