...
首页> 外文期刊>District energy >Saudi Tabreed Projects Under Way
【24h】

Saudi Tabreed Projects Under Way

机译:沙特阿拉伯Tabreed项目正在进行中

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Saudi Tabreed District Cooling Co. is currently executing two district cooling projects in Saudi Arabia, which Managing Director Rasheed Al-Rasheed says are progressing on schedule. Development of a district cooling system to serve King Abdullah Financial District (KAFD) in Riyadh is under way. Total plant capacity will be 100,000 tons of refrigeration. The first phase of the plant (50,000 tons) and related distribution network is expected to be commissioned by mid-2012. Part of the initial phase (11,000 tons) will be commissioned by the end of 2011. Full capacity will be utilized within three or four years. Saudi Tabreed signed an agreement last year with Raydah Investment Co. in consortium with SNC Lavalin-Canada to design, build, operate and maintain the system.
机译:沙特Tabreed地区制冷公司目前正在沙特阿拉伯执行两个地区制冷项目,董事总经理Rasheed Al-Rasheed表示,该项目正在按计划进行。正在为利雅得的阿卜杜拉国王金融区(KAFD)服务的区域供冷系统的开发。工厂总产能将为100,000吨制冷量。该厂的第一阶段(50,000吨)和相关的分销网络预计将于2012年中期投入使用。首阶段的一部分(11,000吨)将于2011年底投入使用。全部产能将在三到四年内使用。沙特Tabreed去年与Raydah Investment Co.与SNC Lavalin-Canada组成的财团签署了一项协议,以设计,建造,运营和维护该系统。

著录项

  • 来源
    《District energy》 |2011年第3期|p.54|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号