...
首页> 外文期刊>Development and Learning in Organisations >Most organizations get evaluation all wrong
【24h】

Most organizations get evaluation all wrong

机译:大多数组织的评估都错了

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Although I no longer work as a research chemist (my first career) I still like to think of myself as a scientist. In science we need to balance theory and evidence - and in technology we apply science in real situations. Hence engineers building a bridge use theory from areas such as physics alongside experimental evidence before they even think about the actual structure they will produce. They evaluate before they do anything. If they did not we would be worried about their professionalism - and the quality of their bridges. It would not be a good idea if the engineers decided to experiment first and evaluate afterwards.
机译:尽管我不再担任研究化学家(我的第一职业),但我仍然喜欢将自己视为科学家。在科学中,我们需要在理论和证据之间取得平衡-在技术中,我们将科学应用于实际情况。因此,工程师甚至在考虑将要产生的实际结构之前,就从物理学等领域建立起桥梁使用理论以及实验证据。他们在做任何事情之前都要先评估。如果他们不这样做,我们将担心他们的专业水平以及桥梁的质量。如果工程师决定先进行实验然后再进行评估,那将不是一个好主意。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号