...
首页> 外文期刊>Journal of Geoscience and Environment Protection >Numerical Study on the Impact of GongJi Road Rain Pump on the Waterlogging in Huinan, Pudong District
【24h】

Numerical Study on the Impact of GongJi Road Rain Pump on the Waterlogging in Huinan, Pudong District

机译:浦东新区公济路雨泵对内涝影响的数值研究

获取原文
           

摘要

To study the rainstorm waterlogging disasterin Huinan, Pudong District, an urban waterlogging model coupled with therainfall runoff sub-model, underground network sub-model and the overland flowsub-model has been set up by MIKE FLOOD. After the validation with the actualreports of the waterlogging in Huinan on Oct. 8th, 2013, the model is adoptedto simulate the overland flood before and after Gongji Road Rain Pump works tostudy the impact of Gongji Road Rain Pump on the waterlogging disaster. Theresults are analyzed and the conclusions are obtained: when Gongji Road RainPump runs, the total flooded area will significantly decrease to .49 km2, about21%, meanwhile, the drowned duration will be shortened in 6 hours, ahead 10hours. Therefore, Gongji Road Rain Pump can alleviate the waterlogging, butsome other measures are still needed to be taken to solve the waterloggingdisaster.
机译:为了研究浦东地区惠南市的暴雨内涝灾害,MIKE FLOOD建立了城市内涝模型与降雨径流子模型,地下网络子模型和陆上径流子模型。在2013年10月8日对湖南省内涝的实际报告进行了验证之后,采用该模型对公济路雨泵工作前后的陆上洪水进行了模拟,研究了公济路雨泵对洪涝灾害的影响。对结果进行分析并得出结论:当公济路雨水泵运行时,总淹水面积将显着减少至0.49 km2,约为21%,同时淹没时间将缩短6小时,提前10小时。因此,公济路雨水泵可以减轻涝灾,但仍需采取其他措施解决洪涝灾害。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号