Evaluating the performance of irrigation systems will assist to distinguish whether the targets and objectives of the irrigation projects are met or not. In this study, a comparative performance evaluation was made on two small scale irrigation schemes in Adami Tulu Jido Kombolcha district Oromia Regional State Central Rift Valley of Ethiopia. The irrigation schemes were Haleku scheme with a command area of 42 ha and 96 beneficiaries, and Dodicha scheme with 75 ha irrigable lands and 150 beneficiaries. Primary and secondary data were collected for the study. The primary data include discharge at diversion point, moisture contents of the soils before and after irrigation, measurement of depth of water applied to the fields. The secondary data include total yields, farm gate prices of irrigated crops, area irrigated per crop per season, crop types, incomes generated by the irrigation associations, investment costs and cost of production and metrological data. The two-irrigation schemes were compared using the IWMI (International Water Management Institute) minimum sets of comparative indicators. The comparative indicators used were Agricultural performance, water use performance, Physical performance and Economic performance. From the analysis of Agricultural outputs, the outputs per cropped area were found to be 2,852.77 US$/ha and 2,179.41 US$/ha for Haleku and Dodicha irrigation schemes respectively, but the values of the output per command area of the schemes in the same order were 2,852.77 US$/ha and 1,278.59 US$/ha. The output per unit irrigation supply of Haleku was 0.18 US$/m3 and of Dodicha was 0.13 US$/m3. Output per water consumed was 0.53 US$/m3 and 0.43 US$/m3 for Haleku and Dodicha irrigation schemes, respectively. With regard to the water use performance, water supply and relative irrigation supply were found to be equal which amount 2.89 and 3.34 for Haleku and Dodicha schemes respectively since all the water is supplied through irrigation; there was no rain fall during the study period. The irrigation ratio of Haleku is 1.00 which means 100% of command area was under irrigation and that of Dodicha was 0.59 which means about 41% of command area was not under irrigation during study period. The gross return on investment was 2.33 and 4.66 by ratio for Haleku and Dodicha irrigation schemes respectively. The financial self sufficiency of both schemes show that 5.29 for Dodicha scheme and 27.76 for Haleku scheme. In general, based on the assessment carried out, it can be concluded that the Haleku irrigation project performs better than Dodicha scheme. For improved performance of the schemes, farmers should share operational experience to one another, and get water management training. Further, it is good to provide simple hydraulic flow metering structures on the canals to monitor water supply and utilization.
机译:评估灌溉系统的性能将有助于区分灌溉项目的目标是否实现。在这项研究中,在埃塞俄比亚的奥罗米亚州立州中部裂谷的Adami Tulu Jido Kombolcha地区的两个小规模灌溉计划上进行了比较性能评估。灌溉计划是Haleku计划,指挥区域为42公顷,受益者为96公顷,Dodicha计划为75公顷的可灌溉土地,有150名受益者。收集主要和次要数据用于研究。主要数据包括分流点的流量,灌溉前后土壤的水分含量,施加到田间的水深的测量。次要数据包括总产量,灌溉农作物的农场门口价格,每季每种作物的灌溉面积,作物类型,灌溉协会产生的收入,投资成本和生产成本以及计量数据。使用IWMI(国际水管理协会)的最低比较指标集对两种灌溉方案进行了比较。使用的比较指标是农业绩效,用水绩效,物理绩效和经济绩效。通过对农业产出的分析,发现Haleku和Dodicha灌溉计划的每个作物面积的产出分别为2,852.77美元/公顷和2,179.41美元/公顷,但在相同的计划下,每个命令区域的产出值订单分别为2,852.77美元/公顷和1,278.59美元/公顷。 Haleku的单位灌溉供给的产出为0.18美元/立方米,而Dodicha的单位灌溉供给为0.13美元/立方米。 Haleku和Dodicha灌溉计划的每单位水消耗的产出分别为0.53美元/立方米和0.43美元/立方米。关于水的使用性能,由于所有水都是通过灌溉提供的,因此,Haleku和Dodicha方案的供水量和相对灌溉量分别为2.89和3.34。在研究期间没有降雨。哈莱库(Haleku)的灌溉率为1.00,这意味着100%的命令区域处于灌溉状态,而多迪查(Dodicha)的灌溉率为0.59,这意味着研究期间约41%的命令区域未处于灌溉状态。 Haleku和Dodicha灌溉计划的投资总回报率分别为2.33和4.66。两种方案的财务自足性表明,Dodicha方案为5.29,Haleku方案为27.76。通常,根据所进行的评估,可以得出结论,Haleku灌溉项目的绩效要优于Dodicha方案。为了提高计划的绩效,农民应该彼此分享运营经验,并接受水管理培训。此外,最好在运河上提供简单的液压流量计结构,以监测供水和利用情况。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号