The construction of the 800-mile Trans-Alaska Pipeline in the 1970s was a remarkable achievement in many ways. With year-round effort, including working through horrendous winters, in terrain that was often highly challenging and mostly far removed from civilization, the pipeline was completed in just 40 months. As notable as the pipeline itself might be, the equipment used to build it was also quite noteworthy. Thousands of machines and vehicles were deployed, many of them highly specialized units developed specifically for the project's unique conditions. Some of the specialized machines were used to construct thousands of support structures that elevated the pipeline above the permafrost: 19 massive percussion drills bored holes for piers; and 34 personnel lifts, built by Insley on converted HC560 hydraulic excavators, were used for structure erection and the installation of pipe.
机译:在许多方面,1970年代800英里跨阿拉斯加管道的建设都是一个了不起的成就。经过一年四季的努力,包括度过了严酷的冬季,该地区通常是极富挑战性的,而且大多与文明相距甚远,管道仅用了40个月就完成了。正如管道本身可能值得注意的那样,用于建造它的设备也非常值得注意。部署了数千台机器和车辆,其中许多是专门为项目的独特条件开发的高度专业化的单元。一些专门的机器被用来建造成千上万的支撑结构,这些结构将管道提升到永久冻土之上:19个大型冲击钻为码头钻孔; Insley在改装的HC560液压挖掘机上建造了34部人员升降机,用于结构的安装和管道的安装。

著录项

  • 来源
    《Construction equipment》 |2017年第11期|58-58|共1页
  • 作者

    THOMAS BERRY;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号