...
首页> 外文期刊>Construction equipment >Three Steps to Replacement
【24h】

Three Steps to Replacement

机译:更换的三个步骤

获取原文
获取原文并翻译 | 示例
           

摘要

We constantly wrestle with the replacement decision. Sometimes it is relatively easy, and we know we have made the right call. Most days, however, we go home and wonder if it would not have been better to keep the old unit a little longer. The replacement decision is complicated because there are many options. All require good information and a measure of clairvoyance regarding both the nature and the volume of future work. It would be easy if we knew what we would be doing in four years when the new crane we plan to purchase is in the prime of its life. Uncertainty is definitely part of the process, but there is much we can do to understand options, manage risks, and improve decisions.
机译:我们不断为更换决定而努力。有时,这相对容易,而且我们知道我们打了正确的电话。但是,大多数时候,我们回到家,想知道将旧设备保留更长的时间是否会更好。替换决定很复杂,因为有很多选择。所有这些都需要有关未来工作的性质和数量的良好信息和透视方法。如果我们知道我们打算购买的新起重机在其生命的高峰期四年后将要做什么,那将很容易。不确定性绝对是过程的一部分,但是我们可以做很多事情来了解选择方案,管理风险和改善决策。

著录项

  • 来源
    《Construction equipment》 |2017年第11期|40-41|共2页
  • 作者

    MIKE VORSTER;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号