...
首页> 外文期刊>ASHRAE Journal >Portsmouth High School Receives Major Facelift
【24h】

Portsmouth High School Receives Major Facelift

机译:朴茨茅斯高中获得重大改头换面

获取原文
获取原文并翻译 | 示例
           

摘要

Portsmouth is the second oldest city in New Hampshire with a major shipbuilding center dating back to the 17th and 18th centuries. Great care has been taken to preserve the community's historic significance while adding contemporary conveniences. That effort continues today as school board officials approved a more than $36 million budget to help bring Portsmouth high School into the 21 st century, enlarging the 1957 facility from 240,000 sq. feet to 324,000. Surrounded by classic New England beauty and Victorian/Colonial homes, Portsmouth's fully accredited high school consistently ranks among the best in the state. But evolving building codes required that substantial improvements be made to modernize instruction areas and achieve code compliance. Improvements included asbestos removal, the installation of central air conditioning, new phone/data networks, updated windows, energy efficient electrical/ plumbing systems, and other educational advancements.
机译:朴茨茅斯是新罕布什尔州第二古老的城市,其大型造船中心可追溯到17和18世纪。在增加当代便利性的同时,我们在保留社区历史意义的同时也非常注意。今天,这项工作仍在继续,校董会官员批准了超过3600万美元的预算,以帮助将朴茨茅斯高中带入21世纪,并将1957年的设施从240,000平方英尺扩大到324,000平方英尺。被经典的新英格兰美女和维多利亚时代/殖民地风格的房屋所环绕,朴茨茅斯获得完全认可的高中一直名列全州最佳中学之列。但是不断发展的建筑法规要求进行实质性改进,以现代化指令领域并实现法规遵从性。改进措施包括清除石棉,安装中央空调,新的电话/数据网络,更新的窗户,节能的电气/水暖系统以及其他教育进步。

著录项

  • 来源
    《ASHRAE Journal》 |2008年第7期|76|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号