...
首页> 外文期刊>Architectural engineering and design management >General contractor's project of projects - a meta-project: understanding the new paradigm and its implications through the lens of entropy
【24h】

General contractor's project of projects - a meta-project: understanding the new paradigm and its implications through the lens of entropy

机译:总承包商的项目项目-元项目:通过熵的视角了解新范式及其含义

获取原文
获取原文并翻译 | 示例
           

摘要

Why do Koskela and others argue that the underlying theory of project management (PM) is obsolete? Project management works for the manufacturing industry, and for the construction industry at both the physical production level and the subcontractor level. Stakeholders, including the owner (along with due diligence, and O&M teams), architect (and the design team), general contractor (and its subcontractor team) create, transmit, process, manage and use information. The boundary between information (creation and transmission) and physical production is where PM controls and predicts cost and schedule and where quality controls fail to work as intended. This paper argues that subcontractors give project numbers for the physical part of the project, while general contractors' project numbers are actually a project of projects (those of the subcontractors). The general coritractor manages a meta-project (term and definition, as related to building construction, coined by Fernandez-Solis). The meta-project paradigm has significant consequences and is the key to a novel understanding of the general contractor role. Lean construction's percent (or promise) plan complete (PPC) gages the reliability of promises made, is a useful and viable indicator of the quality of the schedule, and serves as a surrogate measure of project flow - how smoothly or chaotically a project runs. The PPC is operationalized as an index that meta-project stakeholders can use to calibrate the reliability of work in progress and provide feedback on the predictability/variability of logistic plans. The methodology of this paper uses conceptual analysis, the metonymic mapping of key concepts from the thermodynamics domain to the construction domain and showcases the concepts through PPC case studies. Information entropy theories are discerned in the PPC reports. In conclusion, scientific information theories, principles and characteristics of flow, in contrast to managerial principles, provide a clearer background for visualizing a novel understanding of the state of the project flow at the meta-project level. It could be argued that this paper is about defining a reference discipline and construed as "construction science viewed through the lens of entropy" but this is not the focus of this paper but the topic of the next.
机译:为什么Koskela和其他人认为项目管理(PM)的基本理论已过时?项目管理既适用于制造业,也适用于建筑行业的实际生产水平和分包商水平。利益相关者,包括所有者(以及尽职调查和O&M团队),架构师(和设计团队),总承包商(及其分包商团队)创建,传输,处理,管理和使用信息。信息(创造和传输)与实际生产之间的边界是PM控制和预测成本与进度的地方,以及质量控制无法按预期进行的地方。本文认为,分包商给出项目的物理部分的项目编号,而总承包商的项目编号实际上是项目的项目(分包商的项目)。总承包商负责管理一个元项目(与建筑物相关的术语和定义,由Fernandez-Solis提出)。元项目范例会产生重大影响,并且是对总承包商角色的新颖理解的关键。精益建设的完成百分比(或承诺)计划(PPC)衡量了承诺的可靠性,是进度质量的有用且可行的指标,并且可以作为项目流程的替代指标-项目运行的顺利程度或混乱程度。 PPC已作为索引运行,元项目利益相关者可以使用该指标来校准进行中工作的可靠性,并提供有关物流计划的可预测性/可变性的反馈。本文的方法论使用概念分析,从热力学领域到建筑领域的关键概念的转喻映射,并通过PPC案例研究展示了这些概念。信息熵理论在PPC报告中有所体现。总之,与管理原则相反,科学的信息理论,流程的原理和特征为在元项目级别可视化对项目流程的状态的新颖理解提供了更清晰的背景。可以说这篇文章是关于定义一门参考学科的,并被解释为“从熵的角度看的建筑科学”,但这不是本文的重点,而是下一篇的主题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号