首页> 中文期刊> 《山西建筑》 >长河坝工程大型隧道群平交段施工

长河坝工程大型隧道群平交段施工

         

摘要

The paper points out that large-scale hydropower projects are constructed incessandy in alpine valley area, the main traffic is to con-stitute a large tuunnel. The large tunnel maintains the features that plane cross-paragraph has large span cavern, hard to construct and there are many potential safety hazard and so on. The paper concludes experiences and lemons in order to provide such kind of project with guidance.%指出高山峡谷地带大型水电项目不断开工建设,其场内交通主要以大型隧道群构成,针对大型隧道群施工具有平交段洞室跨度大、施工难度大、施工安全隐患多等特点,总结了长河坝工程交通隧道平交段施工经验和教训,对今后类似工程的施工具有一定指导意义.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号