Combined with foundation pit excavation engineering example of Wuchuan Jinquan square, the application and location method of the double row deep mixing pile in foundation pit slope shorting were introduced, the mixed pile earth retaining wall checking computation was carried out. According to practical construction situation, it concluded that the mixed pile earth retaining wall slope shorting was low cost, fast construction speed, had litter, influence on environment and the effect was better.%结合吴川金泉广场基坑开挖工程实例,介绍了双排深层搅拌桩在基坑护壁中的应用和设置方法,并进行了搅拌桩挡土墙验算,根据实际施工情况得出采用搅拌桩挡土墙护壁造价低,施工速度快,对环境影响小,效果良好.