针对山西大医院综合医疗大楼污水处理工程中采用的CAST工艺进行了介绍,分别阐述了CAST设计基础数据,生物池构造,工作周期设计等内容,并结合其他应用实例运行结果指出该工艺合理可行,值得推广。%This paper introduces CAST technology used in sewage treatment project of comprehensive medical building in Shanxi,respectively describes CAST design base data,biofilter structure,and work cycle design and other content.Combining with other application operation results,it points out that technique is rational and is worth promoting.
展开▼