From aspects of construction personnel level, construction cost, and construction management level etc, it introduces the causes of bored pile broken, and proposes corresponding preventives measures and processing scheme for broken pile, and then points o%从施工人员水平、施工成本、施工管理水平等几个方面对钻孔灌注桩断桩形成的原因进行了介绍,并针对各个环节提出了相应的防治措施及断桩后的处治方案,指出断桩的关键是规范化施工、提高管理水平和增强责任心。
展开▼