Combining with the engineering cases, the paper identifies the feasible schemes for the plugging treatment at the joints between the tower crane foundation and the raft plate, implements a series of measures to deal with it, achieves better effect, and solves the plugging issue at the joints between the tower crane foundation and raft plate, so as to direct similar projects in future.%结合工程实例,针对塔吊基础与筏板接槎部位堵漏处理确定可行性方案,从而采取一系列措施进行实施,取得了良好的效果,有效解决了塔吊基础与筏板接槎部位渗漏问题,对今后同类工程施工具有指导意义。
展开▼