The paper undertakes the stressed analysis and calculation on the complicated super-high No.0 construction by establishing reasonable template design,combining in the engineering as an example,introduces some ideas and methods for the larges-span continuous rigid frame bridge's No.0 and the design and calculation of the super-high and large template design,and proves by the engineering practice that the adopted template design is reasonable and feasible and it can ensure the smooth complete of the project.%对复杂超高大0号块施工通过建立合理的模板设计模型,进行受力分析计算,结合工程实例介绍了大跨度连续刚构梁桥0号块,超高大模板设计与计算的思路和方法,工程实践验证所采用模板设计是合理可行的,保证了工程的顺利完工。
展开▼