Combining with the actual engineering,according to the technological requirements of the beam wharf,the article explores the preliminary design conditions and design schemes of the beam wharf retaining wall,and describes the construction procedures and construction technology of the beam wharf retaining wall,which has provided theoretical guidance for similar engineering.%结合实际工程,根据出梁码头的技术要求,对出梁码头挡墙设计的初始条件以及设计方案进行了探讨,并将出梁码头挡墙的施工流程及施工工艺作了阐述,为类似工程提供了理论指导。
展开▼