Combining the work experience,the paper introduces many different treatment measures according to the problems in the winter construction process in all bridge upper structures of the construction sites in Yuncheng,points out the effective construction scheme,and undertakes the factual illustration,so as to provide the direction for the field construction in future.%结合工作经验,针对多年来在运城路桥各个工地桥梁上部结构冬期施工过程中遇到的各种问题,介绍了很多种不同的处理措施。提出了一套行之有效的施工方案并作了具体阐述,以期为以后现场施工提供指导。
展开▼