Integrating with the actual conditions of the comprehensive hospital ward building,the paper explores the electric installation scheme,takes three construction keys-subdivisional bridge wiring project,cable line engineering,and grounding engineering as the project quality controlling goal,and carries out specific technological study and description,which has certain guiding significance for future similar project.%结合某医药大楼实际情况对其电气安装施工方案进行了探讨,以桥架配线分项工程、电缆线路工程、接地工程这三个施工关键作为项目质量控制目标,进行了较为详细的技术研究和介绍,对今后同类项目具有一定指导意义。
展开▼