Through surveying and analyzing the engineering geology condition of resettlement house site of Longyan industry school,according to in-situ shallow plate load test results,the essay optimizes the experimental results,adopts economic and rational foundation treatment scheme and foundation pattern.As a result,it shortens construction duration,saves engineering cost,and achieves good economic benefits.%通过勘察分析龙岩工业学校安置房场地的工程地质条件,并根据现场浅层平板载荷试验成果进行优化,采用经济、合理的地基处理方案和基础形式,缩短了施工工期,节省了工程造价,取得了较好的经济效益。
展开▼