Taking the vehicle base project along No. 1 Line of some express bus project as the example,the paper undertakes the dewatering de-sign for its foundation pit,according to the features,geological and hydrological conditions,analyzes the underground water piping in the con-struction process,and explores factual treatment measures,so as to accumulate experience for the construction.%以某快速公交工程一号线车辆基地工程为例,通过研究该工程的特点、地质及水文条件,对该基坑进行了降水设计,主要对施工过程中发生的地下水管涌现象进行了分析,并探讨了具体的处理措施,为类似工程施工积累了经验。