以昌吉赣客运专线为例,分析了在可行性研究阶段线路局部地质选线时,线路穿越岩盐矿区时采空区对线路走行方案的决定性作用,指出对于重大不良地质体应坚持绕避原则。%Taking the Chang-Ji-Gan passenger dedicated line as an example,this paper analyzed the decisive role of gob to lines run scheme in lines across the salt mine area,line local geological route selection in feasibility study stage,pointed out that for major adverse geological body should adhere to the avoidance principle.
展开▼