From the internal and external factors of concrete,the paper analyzes the reasons for the quality common diseases of the concrete cul-vert section prefabricating during winter period gibi deserts of Northwest in China,mainly explores the construction control measures,and illus-trates the construction difficulties and main points,construction organization and arrangement,and factual measures for the culvert prefabricating of winter period,so as to provide some scientific reference for construction.%从混凝土的内在因素与外界因素两个角度分析了西北戈壁滩地区冬期混凝土涵节预制的质量通病原因,着重对施工控制措施进行了探讨,阐述了冬期涵节预制的施工重难点、施工组织安排及具体措施,为顺利施工提供了科学依据。
展开▼