Taking eastern anchorage mass concrete temperature control of Baling river bridge as the research content,the paper introduces con-crete mixing proportion design and pouring technologies,mainly explores concrete pouring temperature control,cooling water temperature control and temperature measurement control methods,and finally draws some valuable conclusions with experimental research and theoretical analysis.%以坝陵河大桥东锚碇大体积混凝土温度控制为研究内容,介绍了混凝土配合比设计与浇筑技术,着重对混凝土浇筑温度的控制,冷却水温度的控制及测温控制方法进行了探讨,并通过试验研究与理论分析,得出了一些具有应用价值的结论。
展开▼