根据规范、招标文件及施工指导意见汇编的要求,对泡沫沥青冷再生混合料下面层试验路段的施工与监理要点进行了介绍,归纳了泡沫沥青冷再生下面层施工的各项控制参数,并通过实践验证了施工组织方案及施工工艺的合理性,为类似工程施工提供了参考借鉴。%According some regulation,bidding documents and compilation of construction instruction suggestions,the paper introduces the con-struction supervision points of the foamed asphalt cold-recycling underlying layer trial segment,sums up all kinds of controlling parameter of the construction,and improves the construction organization scheme and the reasonability of the construction craft according to the practice,so as to provide some reference for similar projects.