Combining with the structural features,function and installation assembly relationship of a project offshore platform,this paper made design division to whole structure,and single construction and installation to resolution module,finally assembly various modules so as to become the platform structure of whole offshore,through the modularization design and construction could reduce the cost of structure design,manufac-ture and installation,shorten the project duration,reduced errors.%结合某工程海洋平台的结构特点、功能和安装装配关系,对整个结构进行了设计划分,并对拆分的模块进行单独施工与安装,最后将各个模块进行装配组合成为整个海洋平台结构,通过模块化设计与施工可以降低结构设计、制造和安装的成本,缩短项目工期,减少失误。
展开▼