Combining with the engineering example,this paper introduced the design parameters and compilation basis of cast-in-situ box girder full timbering erection,discussed the foundation treatment scheme in full timbering erection,and elaborated the load calculation process,re-searched the specific measures of timbering configuration,to ensure the stability of timbering and the quality of beam body.%结合工程实例,介绍了现浇箱梁满堂式支架搭设的设计参数及编制依据,探讨了满堂式支架搭设中的基础处理方案,并对荷载的计算过程进行了阐述,同时研究了支架配置的具体措施,以保证支架的稳定性和梁体的质量。
展开▼