Combining with the actual construction experience,from the holing preparation work,pile hole digging,reinforcing cage production, lifting and other aspects,researched and discussed the quality control measures of artificial dig-hole pile in specific construction process,and in view of the safety problems existing in artificial dig-hole pile construction process,put forward corresponding safety control measures,for refer-ence.%结合实际施工经验,从开孔前的准备工作、桩孔开挖、钢筋笼制作、吊装等方面入手,对人工挖孔桩在具体施工过程中的质量控制措施进行了研究探讨,并针对人工挖孔桩施工过程中存在的安全隐患,提出了相应的安全控制措施,以供参考。
展开▼