Taking a community as a specific example,this paper comparatively researched the cost differences of assembly overall building engi-neering and cast-in-place building engineering,analyzed in detail the cost change situation of assembly building engineering,in view of the cur-rent assembly architecture development put forward cost control path.%以某小区作为特定样本实例,对比研究了装配整体式建筑工程与现浇式建筑工程的成本差异,详细分析了装配式建筑工程的成本变动情况,针对当前装配式建筑发展情况提出了成本控制的途径。
展开▼