针对广泛应用的筏形基础和桩基础,提出一个适用于基础工程施工完毕后的封井数量计算公式,并结合工程实例阐述了该计算公式的应用方法,同时对后浇带的抗浮效果进行了研究探讨。%Based on the extensive application of the raft and pile foundations, the paper points out the calculation formula for the number of seal-ing after the complete of the foundation projects, illustrates its application methods by combining with engineering cases, and explores the anti-float effect of the post-cast strip.
展开▼