From the project actual situation,this paper compared the advantages and disadvantages of traditional scaffold erecting system and climbing mold system,researched the climbing mold system combining with the project,through the elaboration of climbing mold construction process,analyzed the construction difficulties,and making measures,and provided technical support for the promotion of the technology.%从工程项目实际情况入手,比较了传统脚手架搭设体系与爬模体系存在的利弊,就爬模体系结合工程项目展开研究,通过阐述爬模施工流程,分析了施工的重难点,并制定了对策,为该技术的推广提供了技术支撑。
展开▼