Combining with the specific engineering examples of Chanba river second phase villas, due to the complexity site conditions, through the comparison of several foundation treatment schemes, determined using PHC pipe pile, using this scheme saved the cost, speed up the con-struction progress, finished the pile foundation construction with good quality and quantity.%结合浐灞二期别墅区具体工程实例,由于场地条件复杂,经过对几种地基基础处理方案的对比,确定了采用PHC管桩,采用该方案节约了成本,加快了施工速度,保质保量地完成了桩基施工。