According to the fact in some architectural project,the paper undertakes the foundation deformation calculation at the settlement post-pouring belt of the connection of the main building and basement,adopts the sequence construction technique,and proves the method can solve the cracks and settlement caused by cancelling the post-pouring belt,so as to shorten the construction period and save cost.%根据某建筑工程的实际情况,对主楼与地库相连部位取消沉降后浇带进行地基变形验算,并采取了跳仓法施工技术,实践证明跳仓法既能够解决取消后浇带引起的裂缝及沉降问题,又可以节省工期,节约造价。
展开▼