Accordinf to the tests,the paper analyzes the factors influencinf the activation of the waste concrete powder from the frindinf time, calcinations temperature,and activator,and achieves come meaninfful conclusion,so as to apply the recycled powder of the waste concrete rea-sonably,and realize the zero-emission of architectural rubbish.%通过试验,从粉磨时间、煅烧温度、激发剂三方面,分析了影响废弃混凝土粉体活化的因素,得到了一些有意义的结论,有利于合理使用废弃混凝土再生粉体,实现建筑垃圾零排放目标。
展开▼