介绍了汾河治理美化二期南延伸段地基工程概况,阐述了详细的施工工艺流程及技术措施,结合该工程的技术参数及要求,提出了一系列质量和安全保证措施,经试验,检测结果均满足设计要求,为类似工程施工提供了参考。%The paper introduces the south-extending section foundation engineering conditions of Fen River beautification at phase Ⅱ,describes specific construction technology procedures and technological measures,and puts forward a series of quality and safety guarantee measures by combining with the engineering technology parameters and demands. Through test,the detection results meet a design demand,which has provid-ed some guidance for similar engineering construction.
展开▼