Combining with Leqingwan coast dam engineering conditions,through embedding original-position detecting instrument,the paper car-ries out dynamic following monitoring for dick closure construction process,specifically analyzes displacement subsidence value after the dike clo-sure,finally points out that:after loading 48 h,the displacement speed convergence is obvious,which meets designed controlling standards.%结合乐清湾港区沿海堤坝工程概况,通过埋设原位观测仪器,对龙口合龙施工实施动态跟踪监测,详细分析了龙口合龙后位移沉降数据,指出施工加载48 h后,位移速率收敛明显,满足设计控制标准。
展开▼